02 July 2009

Annual Electrical Shutdown

Each year over the weekend of the Federal Holiday of Independence Day (4th of July), an electrical shutdown takes place across campus as they perform inspections. On Saturday, July 4th between 6 AM and 8 PM, several buildings will experience power loss. The below notice from the Facilities Division lists the buildings affected and provides guidance on how to prepare for the shutdowns as well as why the shutdowns must happen:

As part of the required annual inspections and preventative maintenance program of the Northeastern University electrical utility system, the buildings listed below require a prolonged electrical shutdown or interruption of power. This shutdown is necessary for proper isolation and inspection of the buildings’ step-down transformers, high-voltage switchgear and distribution switchboard equipment.

As has been the case in previous years, to minimize disruption to University operations, this maintenance shutdown will occur over a weekend.

The electrical outage will commence on Saturday, July 4 at 6:00 AM and it will conclude by 8:00 PM that same day and will affect the following buildings:

Architecture Studio (located at MBTA station)
Behrakis Health Sciences Center
Cargill Hall
Dana Research Center
Dockser Hall
Egan Engineering/Science Research Center
Holmes Hall
Kariotis Hall
Knowles Center
Lake Hall
Latino/a Student Cultural Center
Meserve Hall
Nightingale Hall
Ryder Hall
Shillman Hall
Snell Engineering Center
Stearns Center
West Campus Building A
West Campus Building B
West Campus Building C
West Campus Building E
West Campus Building F
West Campus Building G
West Campus Building H
West Campus Parking Garage
Willis Hall
Power Plant

Only the buildings/locations listed above in this communication are affected by this electrical shutdown. All other campus buildings/locations will not be affected.

It should be noted that as a building/location passes inspection and testing, power will be restored to that particular building. As such, some buildings may have their electrical power restored ahead of the established restoration deadline of 8:00 PM.

To reduce the risk of damage to computer and other sensitive electronic equipment, please turn off all such equipment prior to the shutdowns.

The Facilities Division undertakes these actions to insure that the Northeastern University community is provided with safe and reliable electrical energy. We sincerely appreciate your cooperation and apologize for the inconvenience.

No comments: